2025 Site Hard Surface Improvement
Sector: Manufacturing (Industrial) • Location: Mankato, Minnesota, United States of America
Source: Dodge
The work includes: miscellaneous removals, reclaiming bituminous pavement, bituminous paving/overlay, pavement markings, turf establishment together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Minnesota State Prevailing Wage Rates and Responsible Contractor Certification.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Road, Government, Commercial
- Location
- Mankato, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Site Hard Surface Improvement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes: miscellaneous removals, reclaiming bituminous pavement, bituminous paving/overlay, pavement markings, turf establishment together with numerous related items of work, all in accordance with Plans and Specifications. This project is subject to Minnesota State Prevailing Wage Rates and Responsible Contractor Certification. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Mankato |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Government, Commercial |
Article published date | 2025-03-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- SR 75 FROM SR 2 TO NORTH CAROLINA STATE LINE
- SR 20 FM PRESTON HILLS/LAUREL DR TO CR 715/REYNOLDS RD
- STRUCTURAL STEEL FABRICATION AND ERECTION
- SR 10 FROM CR 107/NORTH LEG DRIVE TO CR 2485/HALE STREET
- CS 493/INDUSTRIAL BLVD FROM SR 19 TO SR 31 - TIA
- SR 19;SR 23; SR 26 & SR 204 @ 9 LOCS - BRIDGE PRESERVATION
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- West lake sammamish parkway phase 2
