2025 Spring Valley - Street & Utility Improvements
Sector: Water Supply and Storage • Location: Spring Valley, Minnesota, United States of America
Source: Dodge
The work includes the construction of approximately: mobilization & traffic ctrl 1 ls excavation: common/subg. 6000 cy aggregate base class 5 2400 cy select granular 3200 cy concrete curb & gutter 3800 LF bituminous pavement 2500 ton 6" - 7" concrete driveway 400 SY 4" - 6" concrete walk 8400 sf 6" perf. PVC pipe drain 3500 LF 6" sanitary service 700 LF 8" - 12" sanitary sewer 1700 LF 48" sanitary
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Road, Government, Cement
- Location
- Spring Valley, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Spring Valley - Street & Utility Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work includes the construction of approximately: mobilization & traffic ctrl 1 ls excavation: common/subg. 6000 cy aggregate base class 5 2400 cy select granular 3200 cy concrete curb & gutter 3800 LF bituminous pavement 2500 ton 6" - 7" concrete driveway 400 SY 4" - 6" concrete walk 8400 sf 6" perf. PVC pipe drain 3500 LF 6" sanitary service 700 LF 8" - 12" sanitary sewer 1700 LF 48" sanitary manhole 110 LF 6" - 8" watermain 1900 LF 6" - 8" gate valve & box 11 EA 1" water service 600 LF ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Spring Valley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Power Transmission, Waste Processing and Treatment, Power Generation (CCGT), Road, Government, Cement |
Article published date | 2025-02-17 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
