2025 Stevens Point Concrete Pavement Repairs
Sector: Road • Location: Stevens Point, Wisconsin, United States of America
Source: Dodge
The contract shall consist of sawing and removal of existing concrete pavement from repair areas, preparing the foundation, drilling and placing new tie-bars and dowels, replacing the removed concrete from repair areas with new concrete, traffic control, cleanup, and all incidental items required to perform the work.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The contract shall consist of sawing and removal of existing concrete pavement from repair areas, preparing the foundation, drilling and placing new tie-bars and dowels, replacing the removed concrete from repair areas with new concrete, traffic control, cleanup, and all incidental items required to perform the work. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
More Road projects in United States of America
- Bothell Everett Highway Overlay Project
- 102nd Ave NE Downtown Access Improvements
- Beardslee Blvd Widening
- 228th St SE Overlay (2nd Ave SE to 9th Ave SE) Project
- 2023 Citywide Pedestrian Safety Improvements Project
- NE 188th St Non-Motorized Improvements
- 2019-ADA Curb Ramps
- NE 185th St Utility Improvements Project
