2025 Street and Utility Improvement-New Prague
Bid results · Minnesota · Last reported Feb 2025
Source: Dodge
Major quantities for the Work include: 9,700 LIN FT REMOVE CURB AND GUTTER 21,900 SQ YD REMOVE BITUMINOUS PAVEMENT (P) 2,700 SQ YD REMOVE DRIVEWAY OR WALK 20,100 CU YD EXCAVATION-COMMON (EV) (P) 14,500 CU YD SELECT GRANULAR EMBANKMENT (CV) (P) 22,700 SQ YD GEOTEXTILE FABRIC, TYPE 4 (P) 5,300 CU YD AGGREGATE BASE (CV) CLASS 5 (P) 4,500 TONS TYPE SP 9.5 AND 12.5 BITUMINOUS MIXTURES 9,050 LIN FT 6" P
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Power Transmission, Electric Vehicles (EVs), Manufacturing (Industrial), Car parking, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road, Automotive
- Location
- New Prague, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Street and Utility Improvement-New Prague
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major quantities for the Work include: 9,700 LIN FT REMOVE CURB AND GUTTER 21,900 SQ YD REMOVE BITUMINOUS PAVEMENT (P) 2,700 SQ YD REMOVE DRIVEWAY OR WALK 20,100 CU YD EXCAVATION-COMMON (EV) (P) 14,500 CU YD SELECT GRANULAR EMBANKMENT (CV) (P) 22,700 SQ YD GEOTEXTILE FABRIC, TYPE 4 (P) 5,300 CU YD AGGREGATE BASE (CV) CLASS 5 (P) 4,500 TONS TYPE SP 9.5 AND 12.5 BITUMINOUS MIXTURES 9,050 LIN FT 6" PERF HDPE PIPE DRAIN 36,700 SQ FT 4" AND 6" CONCRETE WALK 10,500 LIN FT CONCRETE CURB & GUTTER, DE... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | New Prague |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Power Transmission, Electric Vehicles (EVs), Manufacturing (Industrial), Car parking, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road, Automotive |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
