2025 Street Improvements at West Lakeland Township
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
50 EA Clearing & Grubbing 570 LF 15 -36 Storm Sewer Culverts 1,600 LF 4 Drain Tile w/ Backfill and Wrap 125,000 SY Reclaim Existing Bituminous and Base Material 7,000 CY Haul Excess Reclaimed Material Off Site 2,100 CY Excavation Common (Street) 1,300 CY Embankment Common (Grading) 31,000 TN Bituminous Pavement 3,700 SY Patch Bituminous Driveway 1,200 SY Patch Concrete Driveway 15,000 LF Concrete
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Road
- Location
- Stillwater, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Street Improvements at West Lakeland Township
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 50 EA Clearing & Grubbing 570 LF 15 -36 Storm Sewer Culverts 1,600 LF 4 Drain Tile w/ Backfill and Wrap 125,000 SY Reclaim Existing Bituminous and Base Material 7,000 CY Haul Excess Reclaimed Material Off Site 2,100 CY Excavation Common (Street) 1,300 CY Embankment Common (Grading) 31,000 TN Bituminous Pavement 3,700 SY Patch Bituminous Driveway 1,200 SY Patch Concrete Driveway 15,000 LF Concrete Curb and Gutter 79,000 LF Aggregate Shouldering 62,000 LF Pavement Markings 53 SF Sign Panels 45,... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Stillwater |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Manufacturing (Industrial), Commercial, Waste Processing and Treatment, Road |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
