2025 Street Reconstruction and Full Depth Reclamation
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Full depth reclamation of approximately 6 miles of City streets. Approximately 20% includes replacement of bit curb with concrete curb. Replacement of existing culverts, maintenance on existing storm sewer structures, subgrade excavation, grading of reclaim material, topsoil placement, restoration with sod, hydromulch, or erosion control blanket as identified in the plans.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Cement, Waste Processing and Treatment, Car parking, Road, Automotive, Commercial
- Location
- Andover, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Street Reconstruction and Full Depth Reclamation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Full depth reclamation of approximately 6 miles of City streets. Approximately 20% includes replacement of bit curb with concrete curb. Replacement of existing culverts, maintenance on existing storm sewer structures, subgrade excavation, grading of reclaim material, topsoil placement, restoration with sod, hydromulch, or erosion control blanket as identified in the plans. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Andover |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Cement, Waste Processing and Treatment, Car parking, Road, Automotive, Commercial |
Article published date | 2025-04-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
