2025 Street Resurfacing
Sector: Manufacturing (Industrial) • Location: Crystal Lake, Illinois, United States of America
Source: Dodge USA
The work to be performed under this contract shall include, but not be limited to, the removal and replacement of existing pavement and pavement surfaces, the required necessary base prep work to achieve the City standard cross slopes, structure adjustments, hot-mix asphalt placement, pavement markings and all incidental and collateral work necessary to complete the project as shown on the plans a
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Road, Government, Commercial
- Location
- Crystal Lake, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2025 Street Resurfacing
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be performed under this contract shall include, but not be limited to, the removal and replacement of existing pavement and pavement surfaces, the required necessary base prep work to achieve the City standard cross slopes, structure adjustments, hot-mix asphalt placement, pavement markings and all incidental and collateral work necessary to complete the project as shown on the plans at various locations throughout the City and as described in the bid plans & specifications. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Crystal Lake |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Road, Government, Commercial |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Manufacturing (Industrial) projects in United States of America
- CR 275/RIVER ROAD FROM SR 65 TO CR 11/SLASH ROAD
- SOUTH VALDOSTA TRUCK BYPASS
- CR 92/WRIGHTS MILL ROAD @ HUDSON RIVER 7.3 MI SE OF HOMER
- BRIDGE PRESERVATION @ 7 LOCS IN CLARKE & WALTON COUNTY
- LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
- CR 526/OLD MACON RD FM EVERGREEN RD TO WILKINSON COUNTY LINE
- SR 7/US 341 @ SR 74
- ASHFORD-DUNWOODY ROAD EB RAMP @ I-285
