2025 TH-55 Ottawa Watermain Relocation
Sector: Water Supply and Storage • Location: Golden Valley, Minnesota, United States of America
Source: Dodge
Major quantities for the Work include. Description Quantity Unit Remove Bituminous Pavement 2000 SY 8 Sanitary Sewer 180 LF 20 Steel Casing (Jacked) 40 LF 12 PVC Watermain (Open Cut) 950 LF 12 PVC Watermain (Directional Drilled) 940 LF Gate Valves (Various Sizes) 18 EA Seeding 0.3 AC. To provide professional services to design, bid, and perform construction inspection and administration for the TH
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government, Steel, Metal, Commercial
- Location
- Golden Valley, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 TH-55 Ottawa Watermain Relocation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major quantities for the Work include. Description Quantity Unit Remove Bituminous Pavement 2000 SY 8 Sanitary Sewer 180 LF 20 Steel Casing (Jacked) 40 LF 12 PVC Watermain (Open Cut) 950 LF 12 PVC Watermain (Directional Drilled) 940 LF Gate Valves (Various Sizes) 18 EA Seeding 0.3 AC. To provide professional services to design, bid, and perform construction inspection and administration for the TH-55 Frontage Road Watermain Relocation project |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Golden Valley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government, Steel, Metal, Commercial |
Article published date | 2025-07-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
