2025 Vadnais Height Street Improvements
Sector: Water Supply and Storage • Location: Saint Paul, Minnesota, United States of America
Source: Dodge
Utility Street Construction and Excavation Major quantities for the Work include: 1,415 LF Remove & Replace Concrete Curb and Gutter (Spot) 20 RD STA Aggregate Base Preparation 500 TON 2025 Street Improvements (VADNA 182115) Aggregate Base Class 5 6,350 SY Full Depth Reclamation 4,330 SY Mill Bituminous Surface (2 ) 2,000 TON Bituminous Mixture 15 EACH F&I Casting Assembly (Storm & Sanitary) 35 EA
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Power Transmission, Car parking, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road, Manufacturing (Industrial), Automotive
- Location
- Saint Paul, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Vadnais Height Street Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Utility Street Construction and Excavation Major quantities for the Work include: 1,415 LF Remove & Replace Concrete Curb and Gutter (Spot) 20 RD STA Aggregate Base Preparation 500 TON 2025 Street Improvements (VADNA 182115) Aggregate Base Class 5 6,350 SY Full Depth Reclamation 4,330 SY Mill Bituminous Surface (2 ) 2,000 TON Bituminous Mixture 15 EACH F&I Casting Assembly (Storm & Sanitary) 35 EACH S&I Casting Assembly (Storm & Sanitary) 130 LF 12 -24 RC Storm Sewer Pipe 14 EACH Replace Bolt... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Saint Paul |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Power Transmission, Car parking, Commercial, Power Generation (CCGT), Waste Processing and Treatment, Road, Manufacturing (Industrial), Automotive |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
