2025 Valve Replacement Program
Sector: Hydro • Location: Grande Prairie, Alberta, Canada
Source: Dodge
Aquatera is developing the Valve Replacement Program project involving the replacement of 13 valves in 2025. Additional valve replacement work may be awarded under this RFP in 2026 - 2030. Contractor scope includes: Mobilization/Demobilization, Supply/maintenance of all necessary traffic control to complete the job during construction activities, All locates and any required hydro-vac, All require
- Status
- Closed
- Sector
- Hydro, Waste Processing and Treatment, Commercial, Water Supply and Storage, Manufacturing (Industrial)
- Location
- Grande Prairie, Alberta, Canada
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Valve Replacement Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Aquatera is developing the Valve Replacement Program project involving the replacement of 13 valves in 2025. Additional valve replacement work may be awarded under this RFP in 2026 - 2030. Contractor scope includes: Mobilization/Demobilization, Supply/maintenance of all necessary traffic control to complete the job during construction activities, All locates and any required hydro-vac, All required notifications with impacted customers and coordination with Aquatera s Distribution/Collection ... |
Procurement method | |
Budget |
Location
Country | Canada |
State | Alberta |
City | Grande Prairie |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Hydro, Waste Processing and Treatment, Commercial, Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2025-03-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hydro projects in Canada
- Suncor Millennium Naptha Unit and Hydrogen Plant
- Residue Storage Areas and Dams
- Ligne à 120 kV du Grand-Brûlé–Dérivation Saint-Sauveur
- Modernisation du réseau de l’Estrie
- Projets et travaux de construction
- Poste d’Argenteuil à 315‑120‑25 kV et lignes d’alimentation
- Projet de déclassement de la centrale de Gentilly-2
- La Vérendrye-Parent
