2025 Vool Paving Project
Sector: Government • Location: Wausau, Wisconsin, United States of America
Source: Dodge
72 LF Sawcut pavement full depth 600 Ton 3/4 TB leveling coarse 3 average thickness 1,015 SY 3 asphalt binder 1,015 SY 2 asphalt binder and tack coat including flumes 600 LF 3 x 9 asphalt curb to be placed with 2nd lift of asphalt 250 Ton undercutting / widening drive 1,200 LF 1.5' wide shouldering Plans.
- Status
- Closed
- Sector
- Government, Road, Commercial, Manufacturing (Industrial)
- Location
- Wausau, Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Vool Paving Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | 72 LF Sawcut pavement full depth 600 Ton 3/4 TB leveling coarse 3 average thickness 1,015 SY 3 asphalt binder 1,015 SY 2 asphalt binder and tack coat including flumes 600 LF 3 x 9 asphalt curb to be placed with 2nd lift of asphalt 250 Ton undercutting / widening drive 1,200 LF 1.5' wide shouldering Plans. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Wisconsin |
City | Wausau |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Road, Commercial, Manufacturing (Industrial) |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
