2025 Wahnee Road Paving In Place & Related Services
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
The work to be done shall consist of the installation of bituminous concrete materials, reclaim and milling operations in accordance with Connecticut Department of Transportation Standard Specifications for Roads, Bridges and Incidental Construction, Form 819, latest revision, all related sections.
- Status
- Closed
- Sector
- Government, Cement, Commercial, Bridge, Road, Manufacturing (Industrial)
- Location
- Winsted, Connecticut, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Wahnee Road Paving In Place & Related Services
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work to be done shall consist of the installation of bituminous concrete materials, reclaim and milling operations in accordance with Connecticut Department of Transportation Standard Specifications for Roads, Bridges and Incidental Construction, Form 819, latest revision, all related sections. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Connecticut |
City | Winsted |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Government, Cement, Commercial, Bridge, Road, Manufacturing (Industrial) |
Article published date | 2025-09-22 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Government projects in United States of America
- CARTER TOWN ROAD
- DUDLEY-STATE ROUTE 29 ROAD
- CR 299/CCC CAMP ROAD @ EMERY CREEK 6.5 MI SE OF CRANDALL
- SR 202 FROM THOMAS COUNTY LINE TO SR 111
- CR 210/GLYEN HICKMAN RD FROM SR 117 TO CR 356/AIRPORT RD-TIA
- COLUMBUS VIADUCT RAILROAD BRIDGES.
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SIGNAL COMMUNICATIONS; SERVICE & SUPPORT - FY 2018
