2025 Wastewater Collection System Rehabilitation
Sector: Water Supply and Storage • Location: Joplin, Missouri, United States of America
Source: Dodge
To provide all labor, materials, tools, and equipment necessary for the evaluation and rehabilitation of wastewater collection system components. The unit prices submitted are to be utilized by the City of Joplin in executing Work Orders. The contract is to be effective for one year with an option to renew for two additional years. A typical work order could include the evaluation of gravity sewer
- Status
- Prospective
- Sector
- Water Supply and Storage, Manufacturing (Industrial), Power Transmission, Commercial, Waste Processing and Treatment, Government, Power Generation (CCGT)
- Location
- Joplin, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Wastewater Collection System Rehabilitation
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | To provide all labor, materials, tools, and equipment necessary for the evaluation and rehabilitation of wastewater collection system components. The unit prices submitted are to be utilized by the City of Joplin in executing Work Orders. The contract is to be effective for one year with an option to renew for two additional years. A typical work order could include the evaluation of gravity sewer lines and manholes using CCTV television inspection equipment, smoke testing, rehabilitation of ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Missouri |
City | Joplin |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Manufacturing (Industrial), Power Transmission, Commercial, Waste Processing and Treatment, Government, Power Generation (CCGT) |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
