2025 Water Main Replacement Program
Sector: Water Supply and Storage • Location: Lake Havasu City, Arizona, United States of America
Source: Dodge
This project consists of the replacement of approximately 12,000 LF of water main varying in size from 4-inch to 8-inch and varying in material from ACP to PVC. The water main replacements will consist of replacing of the existing main, existing hydrants, and reconnecting existing services. Private water service will be maintained throughout construction. 8-inch water mains will be replaced with l
- Status
- Closed
- Sector
- Water Supply and Storage, Commercial, Waste Processing and Treatment, Bridge, Government
- Location
- Lake Havasu City, Arizona, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Water Main Replacement Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of the replacement of approximately 12,000 LF of water main varying in size from 4-inch to 8-inch and varying in material from ACP to PVC. The water main replacements will consist of replacing of the existing main, existing hydrants, and reconnecting existing services. Private water service will be maintained throughout construction. 8-inch water mains will be replaced with like size; all other mains will be replaced with 6-inch pipe. All new pipes will be installed as PVC |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Arizona |
City | Lake Havasu City |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Commercial, Waste Processing and Treatment, Bridge, Government |
Article published date | 2025-09-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
