2025 Water Main Replacement Program
Sector: Water Supply and Storage • Location: Wilmette, Illinois, United States of America
Source: Dodge
This project consists of water main replacement and pavement resurfacing along Manor Drive between Lake Avenue and Illinois Road in the Village of Wilmette, Cook County, Illinois. The total length of the project is 1,975 feet (0.37 miles). engineering services related to the construction oversight of water main replacement located on Manor Drive ( 2025 Water Main Replacement Program or Work )
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial
- Location
- Wilmette, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Water Main Replacement Program
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This project consists of water main replacement and pavement resurfacing along Manor Drive between Lake Avenue and Illinois Road in the Village of Wilmette, Cook County, Illinois. The total length of the project is 1,975 feet (0.37 miles). engineering services related to the construction oversight of water main replacement located on Manor Drive ( 2025 Water Main Replacement Program or Work ) |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Wilmette |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Road, Waste Processing and Treatment, Commercial |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
