2025 Water Main Replacement Project
Sector: Water Supply and Storage • Location: Long Beach Township, New Jersey, United States of America
Source: Dodge USA
Installation of approximately 4,535 LF of 6-inch, 8-inch, 10-inch and 12-inch PVC C-900 water main piping including abandonment of existing mains; installation of approximately 690 LF of water service laterals; removal and replacement of six (6) existing hydrants; installation of approximately fifty eight (58) new gate valves of various sizes; Initial Pavement Restoration of approximately 4,352 SY
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial
- Location
- Long Beach Township, New Jersey, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2025 Water Main Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Installation of approximately 4,535 LF of 6-inch, 8-inch, 10-inch and 12-inch PVC C-900 water main piping including abandonment of existing mains; installation of approximately 690 LF of water service laterals; removal and replacement of six (6) existing hydrants; installation of approximately fifty eight (58) new gate valves of various sizes; Initial Pavement Restoration of approximately 4,352 SY and Final Pavement Restoration of approximately 9,923 SY; and all testing, disinfection, restrip... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | New Jersey |
City | Long Beach Township |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Road, Government, Commercial |
Article published date | 2025-01-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
