logo
ProjectClosed

2025 Water Pollution Control Facility (WPCF) Upgrade

Closed · Wisconsin · Last reported Feb 2025

Source: Dodge

: The proposed construction consists of improvements to the Village of Sussex Water Pollution Control Facility, including: Improvements to the existing Effluent Tertiary Filters including removal and replacement of the filter media, replacement of filter nozzle assemblies, coating of the inner cell tank walls, removal and replacement of backwash waste butterfly valves, replacement of pneumatic val

Status
Closed
Sector
Water Supply and Storage, Commercial, Waste Processing and Treatment, Government, Airport
Location
Sussex, Wisconsin, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 Water Pollution Control Facility (WPCF) Upgrade

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Water Pollution Control Facility (WPCF) Upgrade” is an infrastructure initiative in the Water Supply and Storage sector, located in Sussex, Wisconsin, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

: The proposed construction consists of improvements to the Village of Sussex Water Pollution Control Facility, including: Improvements to the existing Effluent Tertiary Filters including removal and replacement of the filter media, replacement of filter nozzle assemblies, coating of the inner cell tank walls, removal and replacement of backwash waste butterfly valves, replacement of pneumatic valve control airlines, removal and replacement of cell isolation butterfly valves, installation of ...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Wisconsin

City

Sussex

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Commercial, Waste Processing and Treatment, Government, Airport

Article published date

2025-02-17

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project