logo
ProjectClosed

2025 Waterline Replacement

Closed · Oregon · Last reported Jan 2025

Source: Dodge

The Work Is Summarized as Follows: Approximately 1,427 Linear Feet of Class 52 Ductile lron Water Line, Fire Hydrants, Valves, Fittings, Trench Excavation, Bedding and Backfill, Asphalt Pavement Patching, Saw Cutting, Horizontal Directional Drill (HDD) Water Services, etc.

Status
Closed
Sector
Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government
Location
Keizer, Oregon, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 2025 Waterline Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “2025 Waterline Replacement” is an infrastructure initiative in the Water Supply and Storage sector, located in Keizer, Oregon, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Work Is Summarized as Follows: Approximately 1,427 Linear Feet of Class 52 Ductile lron Water Line, Fire Hydrants, Valves, Fittings, Trench Excavation, Bedding and Backfill, Asphalt Pavement Patching, Saw Cutting, Horizontal Directional Drill (HDD) Water Services, etc.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Oregon

City

Keizer

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government

Article published date

2025-01-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project