2025 Waterline Replacement
Closed · Oregon · Last reported Jan 2025
Source: Dodge
The Work Is Summarized as Follows: Approximately 1,427 Linear Feet of Class 52 Ductile lron Water Line, Fire Hydrants, Valves, Fittings, Trench Excavation, Bedding and Backfill, Asphalt Pavement Patching, Saw Cutting, Horizontal Directional Drill (HDD) Water Services, etc.
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government
- Location
- Keizer, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Waterline Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work Is Summarized as Follows: Approximately 1,427 Linear Feet of Class 52 Ductile lron Water Line, Fire Hydrants, Valves, Fittings, Trench Excavation, Bedding and Backfill, Asphalt Pavement Patching, Saw Cutting, Horizontal Directional Drill (HDD) Water Services, etc. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Keizer |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Government |
Article published date | 2025-01-13 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
