2025 West Side Reconstruction
Sector: Water Supply and Storage • Location: Sartell, Minnesota, United States of America
Source: Dodge USA
Major Quantities For The Work Include: Item Description Unit Estimated Quantity Mobilization Lump Sum 1 Clearing And Gubbing Each 126 Clearing And Gubbing Acre 1 Sawing Pavement (Full Depth) Lin Ft 6,150 Remove Curb And Gutter Lin Ft 11,100 Remove Bituminous Surface (Full Depth) Sq Yd 59,347 Remove Concrete Dpavement (Full Depth) Sq Yd 2,880 Remove Concrete Walk Sq Ft 12,455 Excavation - Common (C
- Status
- Prospective
- Sector
- Water Supply and Storage, Cement, Government, Mass Transit, Rail, Commercial, Car parking, Waste Processing and Treatment, Road, Automotive
- Location
- Sartell, Minnesota, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 2025 West Side Reconstruction
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major Quantities For The Work Include: Item Description Unit Estimated Quantity Mobilization Lump Sum 1 Clearing And Gubbing Each 126 Clearing And Gubbing Acre 1 Sawing Pavement (Full Depth) Lin Ft 6,150 Remove Curb And Gutter Lin Ft 11,100 Remove Bituminous Surface (Full Depth) Sq Yd 59,347 Remove Concrete Dpavement (Full Depth) Sq Yd 2,880 Remove Concrete Walk Sq Ft 12,455 Excavation - Common (Cv) (p) Cu Yd 35,098 Aggregate Base (Cv) Class 5 (p) Cu Yd 20,670 Select Granular Embankment (Cv) ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Minnesota |
City | Sartell |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Mass Transit, Rail, Commercial, Car parking, Waste Processing and Treatment, Road, Automotive |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
