2025 Wolfs Crossing Road Water Main Improvements
Sector: Water Supply and Storage • Location: Oswego, Illinois, United States of America
Source: Dodge
The work shall include, but not limited to, construction of a 12 distribution watermain, pavement patching, driveway removal and replacement, landscaping restoration, possible removal of nonspecial waste material, and all incidental and collateral work necessary to complete the project as described herein for the Wolfs Crossing Road location.
- Status
- Prospective
- Sector
- Water Supply and Storage, Road, Commercial, Government
- Location
- Oswego, Illinois, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 Wolfs Crossing Road Water Main Improvements
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The work shall include, but not limited to, construction of a 12 distribution watermain, pavement patching, driveway removal and replacement, landscaping restoration, possible removal of nonspecial waste material, and all incidental and collateral work necessary to complete the project as described herein for the Wolfs Crossing Road location. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Illinois |
City | Oswego |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Commercial, Government |
Article published date | 2025-03-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
