2025 WWTP Wastewater and Storm Water PS Electrical
Sector: Water Supply and Storage • Location: Sedro Woolley, Washington, United States of America
Source: Dodge
Contractors shall provide electrical services to the City of Sedro-Woolley Wastewater Treatment Plant (WWTP), including Wastewater and Stormwater Pump Stations (PS). Electrical work may consist of, but not be limited to: Troubleshooting and repairing electrical issues with pumps, equipment, backup generators and controls. Programming PLC, and ultrasonic level controls Troubleshooting and repairing
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment
- Location
- Sedro Woolley, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2025 WWTP Wastewater and Storm Water PS Electrical
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Contractors shall provide electrical services to the City of Sedro-Woolley Wastewater Treatment Plant (WWTP), including Wastewater and Stormwater Pump Stations (PS). Electrical work may consist of, but not be limited to: Troubleshooting and repairing electrical issues with pumps, equipment, backup generators and controls. Programming PLC, and ultrasonic level controls Troubleshooting and repairing electrical issues with sanitary sewer and stormwater pump stations, including float and ultrason... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Sedro Woolley |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Power Generation (CCGT), Waste Processing and Treatment |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
