202781CND - South Road Southall UB2 4AA - All Other
One of 10,000+ projects Taiyo tracks in England.
Source: Planning London Datahub
Details of materials in pursuant to conditions 2 and 4 of planning application Ref: 177461CRSA dated 31.01.2018 for ' Revised design of lift shaft, canopy,station building and forecourt; changes to Platform 4 walkway, removal of canopy on Platform 2/3, installation metal fence enclosures for emergency exits to existing station staircases, alterations to materials for station building, Platform 4 a
- Status
- Prospective
- Sector
- Metal, Mass Transit, Rail, Commercial, Road
- Location
- London, England, United Kingdom
- Updated
- 19 Nov 2026
- Source
- Planning London Datahub
ConstructChat
Ask ConstructChat about 202781CND - South Road Southall UB2 4AA - All Other
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Details of materials in pursuant to conditions 2 and 4 of planning application Ref: 177461CRSA dated 31.01.2018 for ' Revised design of lift shaft, canopy,station building and forecourt; changes to Platform 4 walkway, removal of canopy on Platform 2/3, installation metal fence enclosures for emergency exits to existing station staircases, alterations to materials for station building, Platform 4 access walkway and Platform 2/3 lift shaft, brick finish to northern station wall to address condition 3 of planning consent P/2015/0886 dated 05/06/2015 and installation of two platform waiting shelters on Platform 2/3 (Application under Schedule 7 to the Crossrail Act 2008)' | Work Type: |
Location
Country | United Kingdom (UK) |
State | England |
City | London |
Source
Source | Planning London Datahub |
URL |
More Details
Record type | Project |
Sector | Metal, Mass Transit, Rail, Commercial, Road |
Article published date | 2026-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Metal projects in United Kingdom
- River Humber Gas Pipeline Replacement Project, North Lincolnshire
- Total Lindsey Oil Refinery
- Rose Whittle Delta Bloc Barrier System, United Kingdom
- Aulds Frozen Foods, New Manufacturing Plant, Inchinnan, Scotland
- Sealord Fish Processing, Caistor
- Direct Table Foods Bacon Processing Facility
- Michael Uren Biomedical Engineering Research Hub, London
- AstraZeneca Large Scale Laboratory (LSL) Facility, Macclesfield, UK
