logo
ProjectClosed

205 Flood Risk Management

One of 10,000+ projects Taiyo tracks in Arkansas.

Source: Dodge USA

Project Description: The work includes channel widening and straightening for approximately 0.9 miles of Prairie Creek in downtown Russellville, AR (from currently 20 wide to 60 wide at project completion. Work includes excavation of soil material along the bank and in the channel, placement of 12 24 riprap, and construction of retaining walls in select locations. Work also includes the removal an

Status
Closed
Sector
Water Supply and Storage, Bridge, Commercial, Waste Processing and Treatment, Road
Location
Russellville, Arkansas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about 205 Flood Risk Management

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “205 Flood Risk Management” is an infrastructure initiative in the Water Supply and Storage sector, located in Russellville, Arkansas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Project Description: The work includes channel widening and straightening for approximately 0.9 miles of Prairie Creek in downtown Russellville, AR (from currently 20 wide to 60 wide at project completion. Work includes excavation of soil material along the bank and in the channel, placement of 12 24 riprap, and construction of retaining walls in select locations. Work also includes the removal and replacement of bridges at Parkway Avenue and Commerce Street in downtown Russellville, demoliti...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arkansas

City

Russellville

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Bridge, Commercial, Waste Processing and Treatment, Road

Article published date

2024-11-18

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project