205 Tower Mixed Use
Sector: Steel • Location: Bellevue, Washington, United States of America
Source: Dodge
he proposed development consists of a 23-story multi-family residential tower above a five-story podium. The project includes 164 residential units and approximately 5,000 square feet of retail space. The design incorporates integrated parking, active retail frontages, and public spaces aimed at contributing to Bellevue s urban core.
- Status
- Prospective
- Sector
- Steel, Commercial, Residential, Car parking, Manufacturing (Industrial), Automotive
- Location
- Bellevue, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 205 Tower Mixed Use
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | he proposed development consists of a 23-story multi-family residential tower above a five-story podium. The project includes 164 residential units and approximately 5,000 square feet of retail space. The design incorporates integrated parking, active retail frontages, and public spaces aimed at contributing to Bellevue s urban core. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Bellevue |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Steel, Commercial, Residential, Car parking, Manufacturing (Industrial), Automotive |
Article published date | 2025-03-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Steel projects in United States of America
- I-285 @ CR 220/CLARK HOWELL ROAD - REHAB BOX BEAMS
- BRIDGE PRESERVATION @ 6 LOCS IN DISTRICT 4
- DEFERRED SUBMITTAL FOR 201908286: 7 FT WROUGHT IRON FENCE & ENTRY GATE, SOLAR POWERED.
- Pacific Visions Wing at the Aquarium of the Pacific
- WilmerHale Tenant Fit-Out
- UW Seismic Improvements
- DCA Terminal A Improvements
- Kansas City International Airport (MCI) New Single Terminal
