2082 - Ellagh ,
Application finalised · Ireland
for (a) extension (3527m2) to the existing chilled storage building at the rear (north) of the complex (b) the provision of a single storey link corridor and amenity building, (175 + 223m2) along the front and side (south & west) of the existing processing building (c) ESB sub station (23.5m2) and associated site works including truck marshalling yard to the rear (north), drainage connections and
- Status
- Prospective
- Sector
- Commercial
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about 2082 - Ellagh ,
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | application finalised |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | for (a) extension (3527m2) to the existing chilled storage building at the rear (north) of the complex (b) the provision of a single storey link corridor and amenity building, (175 + 223m2) along the front and side (south & west) of the existing processing building (c) ESB sub station (23.5m2) and associated site works including truck marshalling yard to the rear (north), drainage connections and site boundary fencing all within existing liquid milk processing complex. (Gross Floor area of proposed works 3948.5m2) Previous Pl Ref 02/402. Previous Pl Ref: 15/333 |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Sector | Commercial |
Article published date | 2026-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Ireland
- Limerick Tunnel and Ring Road, Republic of Ireland
- N25 New Ross Bypass
- Eli Lilly’s New Bio Manufacturing Plant, Cork
- Bristol Myers Squibb Biologics Manufacturing Facility, County Dublin
- SAFC Pharma API Manufacturing Expansion, Republic of Ireland
- Pfizer’s Biotechnology Campus, Clondalkin, Ireland
- Janssen Sciences’ Biomedicines Manufacturing Facility, Ringaskiddy, Ireland
- Centocor Biopharmaceutical
