logo

210-meter bridge on NH-48

Sector: Road • Location: Gujarat, India

Source: ThePrint

Project
Completed

The project involves the completion of a 210-meter-long pre-stressed concrete bridge over National Highway-48 at Dabhan village near Nadiad, Kheda district, Gujarat, as part of the Mumbai-Ahmedabad bullet train project. The bridge was completed on January 9, 2025, and is constructed using the Balanced Cantilever Method, featuring four spans with specific configurations.

Status
Closed
Sector
Road, Rail, Bridge, Cement
Location
Gujarat, India
Updated
22 Jul 2026
Source
ThePrint

ConstructChat

Ask ConstructChat about 210-meter bridge on NH-48

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “210-meter bridge on NH-48” is an infrastructure initiative in the Road sector, located in Gujarat, India. Taiyo aggregates data on it from ThePrint.

Participants

Not available for this record.

Status

Original status

Completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves the completion of a 210-meter-long pre-stressed concrete bridge over National Highway-48 at Dabhan village near Nadiad, Kheda district, Gujarat, as part of the Mumbai-Ahmedabad bullet train project. The bridge was completed on January 9, 2025, and is constructed using the Balanced Cantilever Method, featuring four spans with specific configurations.

Location

Country

India

State

Gujarat

Source

Source

ThePrint

URL

More Details

Record type

Project

Sector

Road, Rail, Bridge, Cement

Article published date

2025-01-28

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project