210-Metre Bridge for Mumbai-Ahmedabad Bullet Train Project
Sector: Rail • Location: Gujarat, India
Source: Urban Acres
The project involves the completion of a 210-metre-long pre-stressed concrete bridge over National Highway-48 at Dabhan village, Gujarat, as part of the Mumbai-Ahmedabad Bullet Train Project. This bridge is crucial for enhancing connectivity between Mumbai and Ahmedabad, utilizing advanced construction techniques.
- Status
- Closed
- Sector
- Rail, Bridge, Road, Cement, Mass Transit
- Location
- Gujarat, India
- Updated
- 22 Jul 2026
- Source
- Urban Acres
ConstructChat
Ask ConstructChat about 210-Metre Bridge for Mumbai-Ahmedabad Bullet Train Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the completion of a 210-metre-long pre-stressed concrete bridge over National Highway-48 at Dabhan village, Gujarat, as part of the Mumbai-Ahmedabad Bullet Train Project. This bridge is crucial for enhancing connectivity between Mumbai and Ahmedabad, utilizing advanced construction techniques. |
Original sector | Transportation |
Location
Country | India |
State | Gujarat |
Source
Source | Urban Acres |
URL |
More Details
Record type | Project |
Sector | Rail, Bridge, Road, Cement, Mass Transit |
Article published date | 2025-01-21 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
