211 Van Ness Pipe Replacement
Sector: Water Supply and Storage • Location: Peachtree City, Georgia, United States of America
Source: Dodge USA
The existing 18 diameter CMP stormwater drainage pipe adjacent to 211 Van Ness is severely corroded and has partially collapsed. The scope of work for this project includes excavating and replacing the failing 18 CMP with 154 LF of 18 HDPE
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Government, Commercial
- Location
- Peachtree City, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 211 Van Ness Pipe Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The existing 18 diameter CMP stormwater drainage pipe adjacent to 211 Van Ness is severely corroded and has partially collapsed. The scope of work for this project includes excavating and replacing the failing 18 CMP with 154 LF of 18 HDPE |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Georgia |
City | Peachtree City |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Government, Commercial |
Article published date | 2024-04-29 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
