211444 - Windgates , Co. Kildare.
Application finalised · Ireland
a Synchronous Compensator (Electricity Grid stabilisation) development within the townland of Windgates, Co. Kildare within a site area of approximately 1.97 hectares. Permission is sought for 1 High Intertia Synchronous Compensator (HISC) Compound (0.25 hectares) consisting of 1 No. High Intertia Synchronous Compensator (HISC) building enclosed within a steel clad framed, housed structure (12.1m
- Status
- Prospective
- Sector
- Commercial, Steel, Power Generation (CCGT), Power Transmission
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about 211444 - Windgates , Co. Kildare.
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | application finalised |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | a Synchronous Compensator (Electricity Grid stabilisation) development within the townland of Windgates, Co. Kildare within a site area of approximately 1.97 hectares. Permission is sought for 1 High Intertia Synchronous Compensator (HISC) Compound (0.25 hectares) consisting of 1 No. High Intertia Synchronous Compensator (HISC) building enclosed within a steel clad framed, housed structure (12.1m max height and 481 m2) and supported by an electrical container area measuring 355m2 consisting of 8 No. electrical equipment containers with a total area of (238m2), each container measuring 29.75m2, and an external cooler area measuring 180m2 consisting of 4 No. external cooler units, each one measuring 30.5m2, 1 Auxiliary and Start up Static Frequency Converter SFC Transformer, 1 Generator circuit breaker, 1 emergency diesel generator and 1 associated diesel storage tank; A High Voltage (HV) Compound (0.11 hectares) consisting of main transformer and High Voltage (HV) equipment; A Gas Insulated Switchgear (GIS) Building compound and underground grid connection (0.25 hectares) consisting of 1 High Voltage Gas Insulated Switchgear Compound (0.16 Hectares), included within this compound is a HV Gas Insulated Switchgear (GIS) housed structure (13.5m max height and 458m2) and 220kv underground cable connection (188m in length) to adjacent (existing) 220kV Eirgrid Substation; Upgrade to the existing site entrance onto the R406, internal access tracks, fencing, temporary construction compound, landscaping and drainage. Planning permission is sought for a period of 10 years. A Natura Impact Statement (NIS) accompanies this application. All within the townland of |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Sector | Commercial, Steel, Power Generation (CCGT), Power Transmission |
Article published date | 2026-11-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Ireland
- Limerick Tunnel and Ring Road, Republic of Ireland
- N25 New Ross Bypass
- Eli Lilly’s New Bio Manufacturing Plant, Cork
- Bristol Myers Squibb Biologics Manufacturing Facility, County Dublin
- SAFC Pharma API Manufacturing Expansion, Republic of Ireland
- Pfizer’s Biotechnology Campus, Clondalkin, Ireland
- Janssen Sciences’ Biomedicines Manufacturing Facility, Ringaskiddy, Ireland
- Centocor Biopharmaceutical