211444 - Windgates , Co. Kildare.

Application finalised · Ireland

a Synchronous Compensator (Electricity Grid stabilisation) development within the townland of Windgates, Co. Kildare within a site area of approximately 1.97 hectares. Permission is sought for 1 High Intertia Synchronous Compensator (HISC) Compound (0.25 hectares) consisting of 1 No. High Intertia Synchronous Compensator (HISC) building enclosed within a steel clad framed, housed structure (12.1m

Status
Prospective
Sector
Commercial, Steel, Power Generation (CCGT), Power Transmission
Location
Ireland
Updated
19 Nov 2026
Source
Ireland

ConstructChat

Ask ConstructChat about 211444 - Windgates , Co. Kildare.

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “211444 - Windgates , Co. Kildare.” is an infrastructure initiative in the Commercial sector, located in Ireland. Taiyo aggregates data on it from Ireland.

Participants

Not available for this record.

Status

Original status

application finalised

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

a Synchronous Compensator (Electricity Grid stabilisation) development within the townland of Windgates, Co. Kildare within a site area of approximately 1.97 hectares. Permission is sought for 1 High Intertia Synchronous Compensator (HISC) Compound (0.25 hectares) consisting of 1 No. High Intertia Synchronous Compensator (HISC) building enclosed within a steel clad framed, housed structure (12.1m max height and 481 m2) and supported by an electrical container area measuring 355m2 consisting of 8 No. electrical equipment containers with a total area of (238m2), each container measuring 29.75m2, and an external cooler area measuring 180m2 consisting of 4 No. external cooler units, each one measuring 30.5m2, 1 Auxiliary and Start up Static Frequency Converter SFC Transformer, 1 Generator circuit breaker, 1 emergency diesel generator and 1 associated diesel storage tank; A High Voltage (HV) Compound (0.11 hectares) consisting of main transformer and High Voltage (HV) equipment; A Gas Insulated Switchgear (GIS) Building compound and underground grid connection (0.25 hectares) consisting of 1 High Voltage Gas Insulated Switchgear Compound (0.16 Hectares), included within this compound is a HV Gas Insulated Switchgear (GIS) housed structure (13.5m max height and 458m2) and 220kv underground cable connection (188m in length) to adjacent (existing) 220kV Eirgrid Substation; Upgrade to the existing site entrance onto the R406, internal access tracks, fencing, temporary construction compound, landscaping and drainage. Planning permission is sought for a period of 10 years. A Natura Impact Statement (NIS) accompanies this application. All within the townland of

Original sector

Construction

Location

Country

Ireland

Source

Source

Ireland

URL

More Details

Record type

Project

Sector

Commercial, Steel, Power Generation (CCGT), Power Transmission

Article published date

2026-11-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project