211524 - CARTRON ,
Application finalised · Ireland
for the construction of an infill residential development comprising of 7 no. residential units (i.e. 3 no. houses and 4 no. apartments). The development will consist of: -3 no. detached 4 bedroomed houses, -Apartment building, consisting of 2 no. 2 bed ground floor apartments and 2 no. 2 bed first floor apartments, - Removal of stone wall along eastern boundary of site (facing Gort Road), and re
- Status
- Prospective
- Sector
- Automotive, Commercial, Residential, Water Supply and Storage, Road
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about 211524 - CARTRON ,
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | application finalised |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | for the construction of an infill residential development comprising of 7 no. residential units (i.e. 3 no. houses and 4 no. apartments). The development will consist of: -3 no. detached 4 bedroomed houses, -Apartment building, consisting of 2 no. 2 bed ground floor apartments and 2 no. 2 bed first floor apartments, - Removal of stone wall along eastern boundary of site (facing Gort Road), and re-use of stone wall to form part of the façade of the proposed Apartment building fronting onto street, -Re-design of existing vehicular access onto Gort Road, - Removal of 2 no. derelict outbuildings on site, - Connection to public mains water infrastructure, including connection to existing surface water and foul drainage networks, to serve the development, - Provision of a homezone & pocket communal open space, hard and soft landscaping, private open space, surface level car parking, bicycle parking, bin store, footpaths, public lighting, together with site works and services associated with the proposed development. A Natura Impact Statement will be submitted to the planning authority with the application. |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Sector | Automotive, Commercial, Residential, Water Supply and Storage, Road |
Article published date | 2026-11-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in Ireland
- Limerick Tunnel and Ring Road, Republic of Ireland
- N25 New Ross Bypass
- Pfizer’s Biotechnology Campus, Clondalkin, Ireland
- Janssen Sciences’ Biomedicines Manufacturing Facility, Ringaskiddy, Ireland
- Jazz Pharmaceuticals Development and Manufacturing Facility, Athlone
- ILC Dover Manufacturing Facility
- SMART Access Controlled Secure Bike Lockers
- Takeda Bulk API Plant
