logo
ProjectDecision Made

218001 - Mullaghmonaghan , Monaghan , Co. Monaghan

Decision made · Ireland

Monaghan County Council hereby gives notice of its intention to carry out construction of a Pedestrian Safety Scheme at N54/R867 Roundabout (also known as the Margaret Skinnider Roundabout). The proposed works shall comprise, generally, the following: Improved Pedestrian facilities on all arms of the Margaret Skinnider Roundabout, including a Zebra Crossing on Market Road (N54) and Park Street (R8

Status
Prospective
Sector
Power Generation (CCGT), Power Transmission, Road
Location
Ireland
Updated
19 Nov 2026
Source
Ireland

ConstructChat

Ask ConstructChat about 218001 - Mullaghmonaghan , Monaghan , Co. Monaghan

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “218001 - Mullaghmonaghan , Monaghan , Co. Monaghan” is an infrastructure initiative in the Power Generation (CCGT) sector, located in Ireland. Taiyo aggregates data on it from Ireland.

Participants

Not available for this record.

Status

Original status

decision made

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Monaghan County Council hereby gives notice of its intention to carry out construction of a Pedestrian Safety Scheme at N54/R867 Roundabout (also known as the Margaret Skinnider Roundabout). The proposed works shall comprise, generally, the following: Improved Pedestrian facilities on all arms of the Margaret Skinnider Roundabout, including a Zebra Crossing on Market Road (N54) and Park Street (R867) and a signalized pedestrian crossing on the Clones Road (N54), removal of existing uncontrolled crossings on all arms including the uncontrolled crossing on Clones Road adjacent the entrance to the St. Mary's Boys School, improved roundabout geometry which will include relocation of the central island, reduction of the roundabout circulating carriageway to 4.5m and a 1.5m wide hatched area and provision of a 6m wide overrun apron, amendments to the existing kerb line at the entries and exits to the roundabout to provide reduced entry radii, promoting slower speeds, and amendments to the existing splitter islands on all arms of the roundabout, pavement overlay/inlay on the immediate approaches to the roundabout and within the roundabout circulating carriageway, raising of existing chambers and gullies and provision of new gullies where necessary at realigned kerb lines to tie-into the existing drainage provision, undergrounding of some overhead electricity supply cables and subsequent removal of a utility pole within the footpath in the north-eastern quadrant of the roundabout, provision of all regulatory and warning signs and road markings associated with an urban roundabout, upgrading existing pedestrian facilities at the entrance to St. Mary's Boys School through the provision of tactile paving at existing uncontrolled crossing and all associated site works. In accordance with Article 81(ca) and 120(1B)(b)(i) of the above-mentioned regulations, Monaghan County Council, as the competent authority, has concluded from a Screening Determination, based on an examination of the nature, size and location of the proposed development that there is no real likelihood of significant effects on the environment arising from the proposed development and as such has determined that an EIA is not required.

Original sector

Construction

Location

Country

Ireland

Source

Source

Ireland

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Power Transmission, Road

Article published date

2026-11-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project