21807 - Drum na Gaoithe ,
The status, timeline and source of this project. A free account opens every field.
ar chead pleanála le haghaidh mionathbhreithnithe ar pleanáil atá ann cheanna a deonaíodh faoi 19-1581 & 20/1069 le haghaidh forbartha ar thailte CLG atá ann cheana is éard a bheidh san fhorbairt agus sna hathbhreithnithe: 1. Dearadh athbhreithnithe na líonta gabhála liathróid beartaithe ag dhá cheann na páirce le méadú go 16m ar aired agus 30m ar leithead chun na hoibreacha láithreáin go léir a
- Status
- Prospective
- Sector
- Construction
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about 21807 - Drum na Gaoithe ,
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | application finalised |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | ar chead pleanála le haghaidh mionathbhreithnithe ar pleanáil atá ann cheanna a deonaíodh faoi 19-1581 & 20/1069 le haghaidh forbartha ar thailte CLG atá ann cheana is éard a bheidh san fhorbairt agus sna hathbhreithnithe: 1. Dearadh athbhreithnithe na líonta gabhála liathróid beartaithe ag dhá cheann na páirce le méadú go 16m ar aired agus 30m ar leithead chun na hoibreacha láithreáin go léir a bhaineann leo a áireamh. |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Article published date | 2026-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
