21869 - Bray , Co. Wicklow
One of 10,000+ projects Taiyo tracks in Ireland.
Part 8 - Process for the Bray Sustainable Transport Bridge Project - The proposed bridge and link road will consist of a two-lane public transport road 3.25m wide and variable width pedestrian, cyclist and shared path facilities. A new pedestrian boardwalk is proposed along the southern bank wall to link the existing walkway to the bridge crossing
- Status
- Prospective
- Sector
- Mass Transit, Bridge, Road
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about 21869 - Bray , Co. Wicklow
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | new application |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Part 8 - Process for the Bray Sustainable Transport Bridge Project - The proposed bridge and link road will consist of a two-lane public transport road 3.25m wide and variable width pedestrian, cyclist and shared path facilities. A new pedestrian boardwalk is proposed along the southern bank wall to link the existing walkway to the bridge crossing |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Sector | Mass Transit, Bridge, Road |
Article published date | 2026-11-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
