2190 - Demense ,
One of 10,000+ projects Taiyo tracks in Ireland.
1: The two existing facility/office Porto cabins to the side of building and their associated storage container. 2: Retain the existing Air handling unit compound to the rear of building 3. Retain the two existing Porto cabins used for Research and Development at the rear of building 4: Retain the existing substation to the front of the building. Full planning permission also sought to change
- Status
- Prospective
- Sector
- Residential, Commercial
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about 2190 - Demense ,
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | application finalised |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | 1: The two existing facility/office Porto cabins to the side of building and their associated storage container. 2: Retain the existing Air handling unit compound to the rear of building 3. Retain the two existing Porto cabins used for Research and Development at the rear of building 4: Retain the existing substation to the front of the building. Full planning permission also sought to change the use of units 4 and 5 from storage to Research and Development Testing and all ancillary site works. Gross floor space of proposed works: 817 msq |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Sector | Residential, Commercial |
Article published date | 2026-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
