220 KV Transmission Line from Bonai Grid-Substation to Taldih Iron Mine with associated 220 KV Feeder Bay Extension at Bonai Grid
Sector: Manufacturing (Industrial) • Location: Bonai to Taldih, Odisha, India
Source: India Investment Grid (IIG)
Information Steel Authority of India Limited [SAIL] has come up with 220 KV Transmission Line from Bonai Grid-Substation to Taldih Iron Mine with associated 220 KV Feeder Bay Extension at Bonai Grid with a ticket size of 70.82 INR Crores. This project in Manufacturing sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | notice to proceed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Information Steel Authority of India Limited [SAIL] has come up with 220 KV Transmission Line from Bonai Grid-Substation to Taldih Iron Mine with associated 220 KV Feeder Bay Extension at Bonai Grid with a ticket size of 70.82 INR Crores. This project in Manufacturing sub-sector involves The current status of the project is Notice to Proceed and is being developed through the EPC route. Economic/Social Impact of the Project It is a power infrastructure project is for wheeling of power from Grid Sub Station of OPTCL at Bonai to Taldih Iron Mine of SAIL which are about 44 km apart. 33 KV power will be drawn from Bonai and transported to Taldih through Transmission Line. The job involves extension of Bay at GSS Bonai and construction of 172 nos. Transmission towers over a stretch of 44 km. At Taldih the power will be received at Main Receiving Sub Station and will be stepped down to 33kv. This power will be fed to Ore Processing Plant and Equipments to run the mine including loading plant at Barsua Valley |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
