22235 - Tullow , Co. Carlow
The status, timeline and source of this project. A free account opens every field.
development at a site to the south-east of the Tesco Superstore, Tullow, Co. Carlow, which extends generally from Mill Street to the Tullow Wastewater Treatment Plant (WwTP), Tullow, Co. Carlow. The development will consist of (1) the decommissioning of: an existing siphon crossing underneath the River Slaney; Abbeywells Pumping Station (Abbeywells PS); a CSO overflow to the River Slaney near to A
- Status
- Prospective
- Sector
- Automotive, Commercial, Water Supply and Storage, Waste Processing and Treatment, Road
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about 22235 - Tullow , Co. Carlow
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | application finalised |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | development at a site to the south-east of the Tesco Superstore, Tullow, Co. Carlow, which extends generally from Mill Street to the Tullow Wastewater Treatment Plant (WwTP), Tullow, Co. Carlow. The development will consist of (1) the decommissioning of: an existing siphon crossing underneath the River Slaney; Abbeywells Pumping Station (Abbeywells PS); a CSO overflow to the River Slaney near to Abbeywells PS; a CSO overflow to River Slaney near Millstreet junction from existing overflow chamber; an existing pumping main from Abbeywells PS to discharge manhole on N81; and an existing septic tank (2) the partial decommissioning of: an existing combined sewer network on the eastern and western sides of the River Slaney (3) the construction of: a new combined sewer network to connect eastern and western agglomerations to the proposed pumping station; a new gravity sewer crossing under the River Slaney to transfer flows from eastern agglomeration; a new Formula A network pumping station to pass flows to Tullow Wastewater Treatment Plant (Tullow WwTP); a new pumping main to transfer flows from the proposed pumping station to Tullow WwTP; a new storm storage chamber to contribute to a total of 450m3 of storage in the proposed pumping station site; a new overflow sewer from proposed pumping station to River Slaney; a new pumping station site to locate wet well, stormchamber, ESB substation, emergency generator and other ancillary equipment; new storm pumps to facilitate storm overflow discharge to River Slaney; new lifting gantries (2 no.) within the proposed pumping station site to facilitate the removal of the two sets of pumps; a site access route and associated gates; 2 no. car parking spaces; hard and soft landscaping and boundary treatment works; and all associated site development works and services on a site of 1.12ha. A Natura Impact Statement (NIS) has been prepared in respect of the proposed development and will be submitted with the planning application. |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Sector | Automotive, Commercial, Water Supply and Storage, Waste Processing and Treatment, Road |
Article published date | 2026-11-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
