223rd Street Warehouse Development
Construction documents · California · Last reported Sep 2025
Source: Dodge
the 181,013-square foot industrial building includes 171,013 square feet of warehouse space, 5,000 square feet of ground floor office space, and 5,000 square feet of mezzanine office space. The loading area is proposed to face west, featuring 28 dock-high doors located
- Status
- Closed
- Sector
- Cement, Road, Warehouse, Manufacturing (Industrial), Residential, Commercial
- Location
- Carson, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 223rd Street Warehouse Development
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | construction documents |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | the 181,013-square foot industrial building includes 171,013 square feet of warehouse space, 5,000 square feet of ground floor office space, and 5,000 square feet of mezzanine office space. The loading area is proposed to face west, featuring 28 dock-high doors located |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Carson |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Warehouse, Manufacturing (Industrial), Residential, Commercial |
Article published date | 2025-09-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- SR 83 @ SHOAL CREEK
- OPERATE CONCRETE RECYCLING FACILITY UNTIL PERMANANT FACILITY IS APPROVED AND OPERATIONAL ON DEPOT ROAD
- REMOVE TILE ROOF & INSTALL OSB & (N) 30 LB FELT PAPER & NEW CONCRETE TILES (9 LB/SF), COLOR: APPALATIAN BLEND
- SWIMMING POOL REMODEL. UPGRADE PLUMBING, REPLACE CONCRETE, REPAIR POOL FENCING
- (N)WASHING SYSTM & EQUIPMT,REFRIGERATION UNIT,EXHAUST FAN & DUCTING,CONCRETE PAD,(N)HOPPER & INCLINE CONVEYOR,FIRE WALL
- Inova Women's Hospital & Children's Hospital
