225KV OMVG Senegal–The Gambia–Guinea Bissau–Guinea Interconnection Project
Sector: Power Transmission • Location: Gambia
Source: PIPES
The project envisages the construction of a 225 kV double circuit high voltage transmission line loop of approximate length 1,677 km, with associated substations, that shall emanate and terminate in Kaolack (Senegal) through Soma (The Gambia), Mansoa (Guinea Bissau), Linsan (Guinea) and Tambacounda (Senegal) among other locations.
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | under-implementation |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | The project envisages the construction of a 225 kV double circuit high voltage transmission line loop of approximate length 1,677 km, with associated substations, that shall emanate and terminate in Kaolack (Senegal) through Soma (The Gambia), Mansoa (Guinea Bissau), Linsan (Guinea) and Tambacounda (Senegal) among other locations. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | Medium |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
