228th St. SE Roadway Repair near 15th Ave. SE
One of 10,000+ projects Taiyo tracks in Washington.
Source: City of Bothell
Crews repaired the roadway on 228th St. SE just east of 15th Ave. SE to deal with groundwater issues., The project intended to deal with groundwater and rain that has been puddling and freezing in the center of 228th St. SE just east of 15th Ave SE. The project included installing two catch basins and a French drain to collect the water into the storm drain system., The mayor signed a local procla
- Status
- Closed
- Sector
- Water Supply and Storage, Road, Waste Processing and Treatment, Government
- Location
- Bothell, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- City of Bothell
ConstructChat
Ask ConstructChat about 228th St. SE Roadway Repair near 15th Ave. SE
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Crews repaired the roadway on 228th St. SE just east of 15th Ave. SE to deal with groundwater issues., The project intended to deal with groundwater and rain that has been puddling and freezing in the center of 228th St. SE just east of 15th Ave SE. The project included installing two catch basins and a French drain to collect the water into the storm drain system., The mayor signed a local proclamation of emergency that allowed staff to hire a contractor quickly., The work has been completed but a long-term future project will rebuild 228th and deal with the settling of the road. That project may include a more robust drainage system if needed., |
Location
Country | United States of America (USA) |
State | Washington |
City | Bothell |
Source
Source reliability | High |
Source | City of Bothell |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Road, Waste Processing and Treatment, Government |
Article published date | 2023-10-24 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 55 @ CLARKS MILLPOND DAM
- West lake sammamish parkway phase 2
- 98th avenue se (97th place se) and se 11th street slope stabilization
- I-90 - sunset creek - fish passage
- Camden Lift Station
- 2021 Water Main Replacement Project
- LEGALIZE ADDITION 394 SQ FT OF BATHROOM, PATIO COVER WATER HEATER RELOCATION & ASSOCIATED E/P. ADD NEW WALLS TO
