2360508 - Silloge , Navan , Co. Meath
Sector: Energy Storage • Location: Ireland
the development will consist of 10 year planning permission for the construction of a 1. enclosed battery energy storage system compound on a total of up to c. 2.63 hectare site which will be located in the the townland of Silloge, c. 5km north of the settlement of Navan, Co. Meath and will consist of the following elements: • 1 no. Substation Compound, Substation Building and associated electrica
- Status
- Prospective
- Sector
- Energy Storage, Commercial, Telecommunications, Cement, Road
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about 2360508 - Silloge , Navan , Co. Meath
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | application finalised |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | the development will consist of 10 year planning permission for the construction of a 1. enclosed battery energy storage system compound on a total of up to c. 2.63 hectare site which will be located in the the townland of Silloge, c. 5km north of the settlement of Navan, Co. Meath and will consist of the following elements: • 1 no. Substation Compound, Substation Building and associated electrical equipment; • 35 battery units set inside storage blocks on concrete support structures including heating, ventilation and air conditioning unit (HVAC units); • transformer and inverter units; • including access tracks and site entrance along with upgrade words on the public roads (c.450m); • associated electrical cabling and ducting; • security gates and c. 2.6m palisade perimeter security fencing; • CCTV system; • landscaping works; • and all other ancillary and miscellaneous site works including site clearance; site access, internal roads and development of areas of hard standing including a maintenance lay-down area; • c.110m of underground cabling ducts and cable to the neighbouring ESB substation |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Commercial, Telecommunications, Cement, Road |
Article published date | 2026-11-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Energy Storage projects in Ireland
- XEROTECH (IEU G)
- Second Life e-bikes & 3rd Life Batteries
- Smarter renewable energy and heating Management for Arctic and northern Rural Territories
- Storage Platform for the Integration for Renewable Energy
- DART+ Charging Infrastructure Project
- Shannon LNG Power Plant
- Silvermines Hydroelectric Energy Storage Project
- Project Monvallet
