logo
ProjectClosed

23rd Ave SW Sidewalk Construction

One of 10,000+ projects Taiyo tracks in Washington.

Source: Dodge

The 23rd Ave SW Sidewalk Project (13th St SW to 17th St SW) will construct new sidewalks between 13th St SW and 17th St SW creating a safer pedestrian pathway along the road. As part of this project, new stormwater infrastructure will be installed and the existing roadway will be widened to 10-foot lanes. Project includes the installation of retaining walls in order to construct sidewalks and spar

Status
Closed
Sector
Water Supply and Storage, Government, Road, Car parking, Automotive, Waste Processing and Treatment, Commercial
Location
Puyallup, Washington, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about 23rd Ave SW Sidewalk Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “23rd Ave SW Sidewalk Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Puyallup, Washington, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The 23rd Ave SW Sidewalk Project (13th St SW to 17th St SW) will construct new sidewalks between 13th St SW and 17th St SW creating a safer pedestrian pathway along the road. As part of this project, new stormwater infrastructure will be installed and the existing roadway will be widened to 10-foot lanes. Project includes the installation of retaining walls in order to construct sidewalks and spare conduit for future street lighting.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Washington

City

Puyallup

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Government, Road, Car parking, Automotive, Waste Processing and Treatment, Commercial

Article published date

2025-09-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project