24-34 Cimarrom Ridge
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
The scope of work includes, but is not limited to, the construction of a clubhouse, swimming pool, landscaping, and associated amenities as per the provided plans and specifications. Pulte Group will be contracting directly for the following scopes of work: access control, security, audio/visual, furniture, fixtures & equipment, solar, EV chargers & fitness equipment. The project consists of one s
- Status
- Closed
- Sector
- Solar, Commercial, Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Manufacturing (Industrial)
- Location
- Menifee, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 24-34 Cimarrom Ridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Bid Results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The scope of work includes, but is not limited to, the construction of a clubhouse, swimming pool, landscaping, and associated amenities as per the provided plans and specifications. Pulte Group will be contracting directly for the following scopes of work: access control, security, audio/visual, furniture, fixtures & equipment, solar, EV chargers & fitness equipment. The project consists of one single story type v-b clubhouse building with a great room, prep. Kitchen, conference/ flex room, ... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Menifee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Solar, Commercial, Electric Vehicles (EVs), Automotive, Power Generation (CCGT), Manufacturing (Industrial) |
Article published date | 2024-08-12 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Solar projects in United States of America
- I-85 @ SR 1/US 27 - SOLAR PANEL FARM - TRACKING ONLY
- INSTALL ROOF MOUNTED PV SYSTEM 10 MODULES 2.6 KW
- INSTALL ROOF MOUNTED SOLAR PV SYSTEM 8.69 KW 22 PANELS
- PV SOLAR ROOF MOUNT SYSTEM 4.80 KW WIHT 12 MODULES
- AS PER MASTER PV PERMIT 202103084 SOHAY LINE BUILDING 16 UNIT 206 (7) MODULE 2.45 KW SYSTEM
- 8.19 KW ROOF MOUNT SOLAR INSTALL WITH (18) 455W MODULES AND (9) AP SYSTEM DS3-L MICROINVERTERS.
- INSTALL 4.4 KW PV ARRAY WITH (11) 400W MODULES.
- ROOF MOUNT SOLAR: (11) 400W MODULES AT 4.4 KW TOTAL
