240 kW Solar Canopy Project at Pendleton Wastewater Treatment Facility
Sector: Road • Location: Pendleton, Oregon, United States
Source: Business Wire
The project involves the installation of a 240 kW solar canopy at the City of Pendleton's Wastewater Treatment and Resource Recovery Facility (WWTRRF). It is expected to generate 325,000 kWh of electricity annually, offsetting 30% of the facility's energy use. The project is part of a broader initiative including renewable energy and efficiency upgrades, with future plans for a battery energy stor
- Status
- Closed
- Sector
- Road, Energy Storage, Power Generation (CCGT), Water Supply and Storage, Solar, Residential, Government
- Location
- Pendleton, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Business Wire
ConstructChat
Ask ConstructChat about 240 kW Solar Canopy Project at Pendleton Wastewater Treatment Facility
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves the installation of a 240 kW solar canopy at the City of Pendleton's Wastewater Treatment and Resource Recovery Facility (WWTRRF). It is expected to generate 325,000 kWh of electricity annually, offsetting 30% of the facility's energy use. The project is part of a broader initiative including renewable energy and efficiency upgrades, with future plans for a battery energy storage system (BESS). The initiative was delivered through an Energy Savings Performance Contract (ESPC) with Ameresco, ensuring price and performance guarantees and participation from disadvantaged and local businesses. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Oregon |
City | Pendleton |
Source
Source | Business Wire |
URL |
More Details
Record type | Project |
Sector | Road, Energy Storage, Power Generation (CCGT), Water Supply and Storage, Solar, Residential, Government |
Article published date | 2025-06-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
