240 Smith St Fuel System Spill Bucket Replacement
Sector: Consumer Products • Location: North Attleborough, Massachusetts, United States of America
Source: Dodge USA
The Work consists of Replacement of the underground Fuel System Spill Buckets with a new EVR complaint equipment and all work incidental thereto, in accordance with the Specifications herein. The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of e
- Status
- Closed
- Sector
- Consumer Products, Chemical (Industrial), Raw Materials, Government, Manufacturing (Industrial), Commercial
- Location
- North Attleborough, Massachusetts, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about 240 Smith St Fuel System Spill Bucket Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Work consists of Replacement of the underground Fuel System Spill Buckets with a new EVR complaint equipment and all work incidental thereto, in accordance with the Specifications herein. The Contractor shall furnish all labor, services, materials, equipment, plant, machinery, apparatus, appliances, tools, supplies, and all other things necessary to do all work required for the completion of each item of the Work and as herein specified. The Work to be done and paid for under any item sha... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Massachusetts |
City | North Attleborough |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Consumer Products, Chemical (Industrial), Raw Materials, Government, Manufacturing (Industrial), Commercial |
Article published date | 2024-09-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Consumer Products projects in United States of America
- CS 611/SURSSON STREET FROM SR 4 TO OLD BEN CARTER ROAD - TIA
- EAST TOLLISION STREET
- NORMAN BERRY DR/BOBBY BROWN FROM SUMNER PARK TO VIRGINIA AVE
- NEW DETACHED ADU, 840 SQ.FT. AND NEW PORCH, 32 SQ.FT.
- NEW DETACHED ADU 799 SQ. FT. - 3 BED 2 BATH
- BLDG 3, UNIT 4, NEW TOWNHOME WITH GARAGE 1605 SQ FT LIVING, 482 SQ FT GARAGE
- The Kia Forum
- William R. Boone High School
