logo

24/07768/NMA - 59 Chester Row SW1W 8JL - All Other

Source: Planning London Datahub

ProjectBP
Approved

Amendments to planning permission dated 10 January 2023 (RN: 22/07918/FULL) for 'Replacement lean to infill extension with new timber frame, adjust and increase existing opening on the rear elevation, new timber frame, doors to Lower Ground Floor and Ground Floor to rear extension, new condensing unit to external front light well with acoustic enclosed Louvred door beneath proposed steel stair, re

Project Information FAQ

Project Information

5 Q
The project "24/07768/NMA - 59 Chester Row SW1W 8JL - All Other" is an infrastructure initiative in the Metal, Steel, Forest Products and Packaging sector, located in London, United Kingdom (UK). Taiyo aggregates data from Planning London Datahub, including information on sponsoring government bodies, EPCs, and contractors.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

approved

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Amendments to planning permission dated 10 January 2023 (RN: 22/07918/FULL) for 'Replacement lean to infill extension with new timber frame, adjust and increase existing opening on the rear elevation, new timber frame, doors to Lower Ground Floor and Ground Floor to rear extension, new condensing unit to external front light well with acoustic enclosed Louvred door beneath proposed steel stair, replacement of existing front windows with new hardwood slimline double glazed windows, installation of photovolatic panels at roof level, new external metal stair to front lightwell, new Portland Stone to existing main entrance to the front elevation, existing steel balustrade ground Floor rear elevation extended to all terrace'. Namely, to alter the design of the front lightwell stair. | Work Type: Non-Material Amendment

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data