24081 Amlbaml Aml
Sector: Waste Processing and Treatment • Location: Madisonville, Kentucky, United States of America
Source: Dodge
Estimated Length of Project: Substantial Completion 180 Calendar Days Final Completion The project will grout remaining voids in an AML eligible underground coal mine in the 11 Coal Seam known locally as the Grapevine Mine. The Dorothy Moore residence and surrounding residences have been damaged by mining subsidence. A sinkhole depression has been verified by comparing current Lidar topography to
- Status
- Closed
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Road, Commercial
- Location
- Madisonville, Kentucky, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 24081 Amlbaml Aml
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | bid results |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Estimated Length of Project: Substantial Completion 180 Calendar Days Final Completion The project will grout remaining voids in an AML eligible underground coal mine in the 11 Coal Seam known locally as the Grapevine Mine. The Dorothy Moore residence and surrounding residences have been damaged by mining subsidence. A sinkhole depression has been verified by comparing current Lidar topography to 2021 Lidar topography. Neighboring properties also show surface expression of the mine subsidence. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Kentucky |
City | Madisonville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Road, Commercial |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- JACK FOUNTAIN/HOLLOWAY RAY FM SNOWHILL CHURCH TO BRANCH
- West lake sammamish parkway phase 2
- 228th St. SE Roadway Repair near 15th Ave. SE
- Camden Lift Station
- REPLACE EXIST. CONVIENENCE STORE W/ NEW ONE, UPGRADE LANDSCA PE, SITE LIGHTING, DRAINAGE. ADD STARBUCKS DRIVETHRU W/ SPR
- PHASED APPROVAL FOR 1) METAL FRAMING & SHEETROCK & 2) 3 UNDE R SLAB DRAINS. REFER TO MAIN PERMIT 202205223
- (N) COMMERICAL SINKS: 3-COMPARTMENT SINK AND 2 ADDITIONAL SINKS WITH DRAINAGE AND WATER.
- NEW ADA BATHROOM PER PLAN AND SPECIFICATIONS AREA 66SF SCREE NED. (N) 4" SEWER LATERAL CONNECTION, (N) WATER FOUNDATION
