242425CND - Ealing Green London W5 5EP - All Other
The status, timeline and source of this project. A free account opens every field.
Source: Planning London Datahub
Details of Foul water capacity in pursuant of condition 25 of planning permission reference 223616FUL dated 22/12/2022 for: Construction of four buildings, ranging in height from 4 to 6 storeys, to provide studio space for film, television, and entertainment production, offices and workshops. (Use Class E) | Work Type: Approval of details reserved by a condition (discharge)
- Status
- Prospective
- Sector
- Water Supply and Storage
- Location
- London, England, United Kingdom
- Updated
- 19 Nov 2026
- Source
- Planning London Datahub
ConstructChat
Ask ConstructChat about 242425CND - Ealing Green London W5 5EP - All Other
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | approved |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Details of Foul water capacity in pursuant of condition 25 of planning permission reference 223616FUL dated 22/12/2022 for: Construction of four buildings, ranging in height from 4 to 6 storeys, to provide studio space for film, television, and entertainment production, offices and workshops. (Use Class E) | Work Type: Approval of details reserved by a condition (discharge) |
Location
Country | United Kingdom (UK) |
State | England |
City | London |
Source
Source | Planning London Datahub |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage |
Article published date | 2026-05-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United Kingdom
- Brigg Biomass Power Plant North Lincolnshire
- Gas to the West Project
- River Humber Gas Pipeline Replacement Project, North Lincolnshire
- Horse Hill Oil Field, Surrey
- Nestle Ski Yoghurt Line Expansion, Cuddington, Cheshire
- Costa Coffee Roastery, Basildon, Essex, UK
- Aulds Frozen Foods, New Manufacturing Plant, Inchinnan, Scotland
- Sealord Fish Processing, Caistor
