24.4 MGD - Denton Creek Regional Wastewater System
Sector: Waste Processing and Treatment • Location: Dallas, Texas, United States of America
Source: Dodge
The Project scope includes, but is not limited to, the following major work items: Design, fabrication, assembly, shipment, installation support, testing, training, startup and warranty of a Drum Screening system, to be used as fine screening, post coarse screening, to protect the integrity of the downstream membrane bioreactor (MBR) system at the Denton Creek Regional Wastewater System. The equip
- Status
- Prospective
- Sector
- Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Rail, Commercial, Government
- Location
- Dallas, Texas, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 24.4 MGD - Denton Creek Regional Wastewater System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | gc bidding |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Project scope includes, but is not limited to, the following major work items: Design, fabrication, assembly, shipment, installation support, testing, training, startup and warranty of a Drum Screening system, to be used as fine screening, post coarse screening, to protect the integrity of the downstream membrane bioreactor (MBR) system at the Denton Creek Regional Wastewater System. The equipment, material, ancillary systems, instrumentation, analyzers and services specified shall be des... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Texas |
City | Dallas |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Water Supply and Storage, Manufacturing (Industrial), Rail, Commercial, Government |
Article published date | 2025-07-14 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in United States of America
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Laguna Canyon Road , Road Improvements ( Segment 4 ) ( Phases 2 to 4 )
- Panorama Heights Drainage and Road Improvements
- Modjeska Grade Road , Road and Drainage Improvements
- Street Drainage Improvements ( Annual )
- Barrett Lane Drainage and Sidewalk Improvement
- Ronald Caspers Wilderness Park - Maintenance Building - Renovation
- West Bay Yards
