2453 Camino Ramon Multi-Family Development w/ Parking Garage
Sector: Cement • Location: San Ramon, California, United States of America
Source: Dodge
The project includes demolition of an existing 1-story Office building to construct two new multifamily residential buildings, totaling 200 residential units and 120 parking spaces. Building 1 is a 7-story multifamily building of 5-story Type IIIA over 2-story Type IA construction with courtyard on the podium level. It includes 120 residential units and 120 parking spaces in an interior parking ga
- Status
- Prospective
- Sector
- Cement, Road, Residential, Car parking, Manufacturing (Industrial), Commercial, Automotive
- Location
- San Ramon, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about 2453 Camino Ramon Multi-Family Development w/ Parking Garage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planning Schematics |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project includes demolition of an existing 1-story Office building to construct two new multifamily residential buildings, totaling 200 residential units and 120 parking spaces. Building 1 is a 7-story multifamily building of 5-story Type IIIA over 2-story Type IA construction with courtyard on the podium level. It includes 120 residential units and 120 parking spaces in an interior parking garage. Building 2 is a 6-story senior living building of 5-story Type IIIA over 1-story Type IA co... |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | San Ramon |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Cement, Road, Residential, Car parking, Manufacturing (Industrial), Commercial, Automotive |
Article published date | 2025-02-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Cement projects in United States of America
- Redwood Road
- WEST SUNSET BOULEVARD & GARDEN AVENUE
- D Street Sidewalk Improvement
- Replacement of the tunnel ceiling in the circular section of the tunnel, repair of the tunnel liner arch and the reconstruction of the concrete deck and upgrade the safety systems in Summer tunnel, Massachusetts (United States)
- Replacing the reinforced concrete deck and superstructure for Turnpike highway bridges in Union County, New Jersey (United States)
- Imola Avenue Rehabilitation (Soscol Ave to East End)
- Traffic Calming & Safety Improvements at Trail Crossings
- Salt Creek Beach - Parking Lot Lighting Replacement and Electrical Repairs
