2460419 - Railway Road , Cavan , Co.Cavan
Sector: Electric Vehicles (EVs) • Location: Ireland
for (1) Demolition of existing buildings on-site and associated site clearance works, (2) provision of 4-storey mixed-use commercial building which will comprise of 2no. retail units at ground level and a total of 11no. apartments which there are 2no. 1 bed units, 3 no. 2 bed units and 6no 3 bed units all with balconies or ground floor terraces. (3) provision of 1no. single storey new storage buil
- Status
- Prospective
- Sector
- Electric Vehicles (EVs), Rail, Automotive, Commercial, Mass Transit, Water Supply and Storage, Road
- Location
- Ireland
- Updated
- 19 Nov 2026
- Source
- Ireland
ConstructChat
Ask ConstructChat about 2460419 - Railway Road , Cavan , Co.Cavan
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | incompleted application |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | for (1) Demolition of existing buildings on-site and associated site clearance works, (2) provision of 4-storey mixed-use commercial building which will comprise of 2no. retail units at ground level and a total of 11no. apartments which there are 2no. 1 bed units, 3 no. 2 bed units and 6no 3 bed units all with balconies or ground floor terraces. (3) provision of 1no. single storey new storage building (4) provision of single storey bin storage facilities (5) provision of electric vehicle charge points with associated site infrastructure. (7) alterations to site entrance (8) connection to existing internal foul, storm and water services and all associated site development works |
Original sector | Construction |
Location
Country | Ireland |
Source
Source | Ireland |
URL |
More Details
Record type | Project |
Sector | Electric Vehicles (EVs), Rail, Automotive, Commercial, Mass Transit, Water Supply and Storage, Road |
Article published date | 2026-11-07 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Electric Vehicles (EVs) projects in Ireland
- ESB NETWORK AND E-CARS INFRASTRUCTURE
- Aghada 430MW CombinedCycle Power Plant
- Second Life e-bikes & 3rd Life Batteries
- Smart Shared Green Mobility Hubs
- ESB Electricity Grid Upgrade
- Dublin Airport Campus Electrification
- Carbon-Based Materials Development for Sulfur Cathodes and High-Capacity Lithiated Silicon Anodes in LiSi-S Batteries
- Novel porous graphite as cathodes for advanced aluminium-ion batteries
